Near-Miss-Informed Occupational Safety Risk Assessment of Upper-Structure Construction Using HIRARC Method

Authors

DOI:

https://doi.org/10.26877/ijosbie.v7i2.1365

Keywords:

construction project, HIRARC, near miss, occupational safety, risk assessment

Abstract

Near-miss observations can reveal hazards that require attention before construction accidents occur. This study assessed upper-structure work at a building construction project in Indonesia using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method. Observations, interviews, job safety analysis, expert review, and questionnaires completed by 31 project personnel were used to identify and assess hazards. Twenty-one indicators were retained for analysis. The reported Cronbach’s alpha values were 0.955 for likelihood and 0.967 for severity. Eight indicators obtained a risk score of 6, while thirteen indicators obtained a score of 4, all were classified as low-to-medium risk according to the project risk matrix. The higher-scoring indicators involved sharp materials, scaffolding, material handling, reinforcement fabrication, and access conditions. Engineering controls, task-specific supervision, housekeeping, and appropriate personal protective equipment were proposed. The assessment supports local risk-control prioritization, although perception-based severity ratings and the absence of before-and-after measurements limit conclusions regarding accident reduction.

Author Biographies

  • Mirnayani, Universitas Mercu Buana

    Department of Civil Engineering

  • Daffa Rifky Fadhilah, Universitas Mercu Buana

    Department of Civil Engineering

References

[1] E. R. Kabul and F. Yafi, “HIRARC Method Approach As Analysis Tools In Formingoccupational Safety HealthManagement And Culture,” Sosiohumaniora, vol. 24, no. 2, p. 218, Jul. 2022, doi: 10.24198/sosiohumaniora.v24i2.38525.

[2] L. Setiawan, A. Rahmatullah, I. Muhammad, A. S. Rini, S. Hanan, and T. R. H. Pratama, “Penerapan K3 Menggunakan HIRARC (Hazard Identification Risk Assessment and Risk Control) pada Perusahaan Konstruksi di Cilegon,” Industrika : Jurnal Ilmiah Teknik Industri, vol. 8, no. 2, pp. 268–278, Apr. 2024, doi: 10.37090/indstrk.v8i2.1516.

[3] P. Duan and J. Zhou, “A Science Mapping Approach-Based Review of Near-Miss Research in Construction,” Engineering Construction &Amp; Architectural Management, 2022, doi: 10.1108/ecam-09-2021-0797.

[4] Z. Woźniak and B. Hoła, “The structure of near misses and occupational accidents in the polish construction industry,” Heliyon, vol. 10, no. 4, p. e26410, Feb. 2024, doi: 10.1016/j.heliyon.2024.e26410.

[5] M. Li, Q. Lin, and H. Jin, “Research on Near-Miss Incidents Monitoring and Early Warning System for Building Construction Sites Based on Blockchain Technology,” J. Constr. Eng. Manag., vol. 149, no. 12, Dec. 2023, doi: 10.1061/JCEMD4.COENG-13979.

[6] M. Al Shuaaili, M. AL-Alawi, B. Al Mawli, A. Al-Mamun, and M. Al Shahri, “Near-Miss Accidents Data Analysis and Knowledge Dissemination in Water Construction Projects in Oman,” 2022, doi: 10.2139/ssrn.4122944.

[7] Danang Hadi Wibowo, Nova Pangastuti, and Sepriandi Parningotan, “Analisis Risiko K3 Dengan Menggunakan Metode Hazard Identification, Risk Assessment and Risk Control (HIRARC) Pada Gedung HDI Hive Menteng,” Venus: Jurnal Publikasi Rumpun Ilmu Teknik , vol. 2, no. 4, pp. 249–271, Jul. 2024, doi: 10.61132/venus.v2i4.427.

[8] H. F. Nababan, D. R. O. Walangitan, and P. A. K. Pratasis, “Analisis risiko menggunakan pendektan Job Safety Analysis (JSA) dengan menggunakan pendekatan Hazzard Identification, Risk Assessment, Risk Control (HIRARC) pada pembangunan tahap II Christian Center, Manado,” TEKNO, vol. 21, no. 83, pp. 215–221, 2023, doi: https://doi.org/10.35793/jts.v21i83.46963.

[9] S. A. Pramesthi, R. Anwar, and L. Susanti, “Risk Analysis of Occupational Safety and Health Analysis Using the HIRARC Method at Building Construction,” ASTONJADRO, vol. 14, no. 2, pp. 484–497, May 2025, doi: 10.32832/astonjadro.v14i2.17359.

[10] P. Arumsari, P. A. Satriya, E. D. Wibawa, and A. D. Putri, “Occupational safety & health risk analysis in formwork in high-rise building projects,” IOP Conf. Ser. Earth Environ. Sci., vol. 1324, no. 1, p. 012029, Apr. 2024, doi: 10.1088/1755-1315/1324/1/012029.

[11] M. Daud, M. A. Budihardjo, and R. R. Isnanto, “Evaluasi Risiko Kesehatan dan Keselamatan Kerja dengan Metode Hirarc pada Proyek Pembangunan Sistem Penyediaan Air Baku Bendungan Pengga Kabupaten Lombok Tengah,” Jurnal Profesi Insinyur Indonesia, vol. 1, no. 3, pp. 104–111, Feb. 2023, doi: 10.14710/jpii.2023.17478.

[12] L. Leonardo and E. Sarvia, “Hazard identification risk assessment and risk control (HIRARC) of safety junior supervisor in a construction company,” Journal Industrial Servicess, vol. 8, no. 1, p. 99, Jul. 2022, doi: 10.36055/jiss.v8i1.14719.

[13] Mirnayani, “Analisis Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja pada Proyek Penanganan Muara Sungai dengan FAHP,” Rekayasa Sipil, vol. 13, no. 1, pp. 38–48, 2024, doi: 10.22441/jrs.2024.v13.i1.05.

[14] M. Mirnayani, M. F. Noor Aulady, and R. H. Novianto, “Ergonomic Risk Assessment of Construction Workers Using RULA, REBA, and NBM Methods: A Case Study in Bandung, Indonesia,” Lean Construction Journal, pp. 249–262, Apr. 2026, doi: 10.60164/cft04ppwoy.

Downloads

Published

2026-11-14

Issue

Section

Articles